Projects

Search our Site

Great work comes with understanding our clients' needs

image

City of Los Angeles

The Sixth Street Viaduct Bridge Replacement Project - The City of Los Angeles, Bureau of Engineering is working in partnership with the California Department of Transportation (Caltrans) to design a new bridge.
image

East Los Angeles College

Weingart Stadium - In 2011, Pacifica Services Inc. collaborated with the Los Angeles Community College District’s (LACCD) East Los Angeles College (ELAC) campus to renovate its aging Weingart Stadium.
image

LAC/USC Medical Center Replacement

A $818 million community-enhancing project, Pacifica Services Inc. was a vital partner in the areas of providing Design and Construction Management Services.
image

Los Angeles Unified School District

Since 1997, Pacifica Services Inc. has collaboratively worked with the Los Angeles Unified School District’s (LAUSD) overall building program valued at $27 billion to positively transform its vast and intricate learning environments.
image

Los Angeles Community College District

Since 2001, Pacifica Services Inc. has partnered with the Los Angeles Community College District’s (LACCD) Sustainable Building Program to provide sophisticated and diverse services to dramatically move nine college campuses to the forefront of sustainable construction, green-collar job preparation, and renewable energy generation.
image

LAC Metropolitan Transportation Authority

The Purple Line Extension will extend from the current terminus at Wilshire/Western westward for approximately nine miles and includes seven new stations.
image

Los Angeles World Airports

Pacifica Services Inc. is currently providing Facility Management, Scheduling, and Planning services for the implementation of FM business process and the collection of F/S/C data at Los Angeles World Airports (LAWA).
image

LAC Department of Public Works

Pacifica provided Construction Management and Inspection Services for the ongoing condition assessment of the Dominguez Gap Barrier project facilities and assisted in the implementation of the non-stormwater outfall screening portion of the USGR EWMP Group Draft CIMP.
image

Upper San Gabriel Municipal Water District

With increasing climate changes and growing demand to provide sustainable solutions while maintaining high quality water supply, Upper District proposed multiple construction packages in collaboration with City of Industry’s Recycled Water Project to increase water reclamation piping and improve existing reservoirs.
image

Central Basin Municipal Water District

Pacifica Services Inc. provided staff augmentation services to Central Basin Municipal Water District on various projects valued at over $140 Million. Pacifica Services Inc. provided comprehensive professional services including Project Management, Civil and Environmental Engineering, Construction Management, and Inspections.
image

University of California, Riverside

Serving as the project manager Genomics Building and the Arts Building Restoration projects, Pacifica played a key role in the completion of the 2 construction projects on campus.
image

Rio Hondo College

Pacifica collaboratively worked on a campus wide site infrastructure project that would be utilized for existing campus facilities, as well as future structures. The utility infrastructure project included new underground utilities.
image

City of El Monte

Since 2012, Pacifica has successfully provided vital staff augmentation and various services to enhance the City of El Monte’s Public Works Department. With a Pacifica personnel as the Interim Public Works Director, Pacifica managed an annual Capital Improvement Project Budget over $50 million.
image

City of Long Beach

In partnership with the City of Long Beach, Pacifica Services Inc. works in close collaboration with contractors to proactively identify and remedy any issues to ensure that compliance with various requirements are met throughout all phases of the projects.
image

City of Cudahy

Pacifica assisted the City of Cudahy in determining specific labor standards parameters applicable for the projects and helped package the RFP by providing applicable contract and labor compliance language and corresponding forms as it pertained to CDBG, Section 3, EEO, and labor compliance requirements.
logo
106 S Mentor Ave # 200
Pasadena, CA 91106

9:00 a.m. to 5:00 p.m., Monday-Friday
Closed weekends & holidays

Room Booking

Thanks for staying with us! Please fill out the form below and our staff will be in contact with your shortly.