Long Beach Airport Terminal Area Improvements, Phases 1 & 2 – Long Beach, CA
The Long Beach Airport Terminal Area Improvements project is a design-build project that is taking place across the entire landside portion of this fully operational international airport. Structural work consists of a seismic retrofit and restoration to the 1941-era historic terminal. Additional construction includes a new ticketing building; a new Checked Baggage Inspection System (CBIS) facility; new baggage claim systems; new concession spaces; a new public plaza; restroom renovations; new rental car counters and parking lot; ground transportation facility improvements; and roadway and signage improvements. Close coordination is critical with Landside and Airside Operations from the beginning of the design-build process through the end of construction to reduce security concerns, minimize interruptions, and allow for continuity of building services.
Pacifica is providing Labor Compliance monitoring and oversight of participation in Davis-Bacon, State/Federal Prevailing Wage Labor Compliance, City-wide Community Workforce Agreements/Project Labor Agreements and Small and Disabled Enterprise utilizations for the various projects at Long Beach Airport.
In addition to Terminal Area Improvements Phases I and II, Pacifica has provided compliance monitoring on projects including:
Airline Ramp Office Utility Stub Ups
Taxiway Golf Shoulder Repair
Taxiway D Pavement Repair
Taxiway L Repair
Client
City of Long Beach/Long Beach Airport
Year Completed
2011-Ongoing
Services Provided
Labor Compliance Monitoring
Delivery Method
Design-Build